Description: <DIV STYLE="text-align:Left;"><DIV><DIV><P><SPAN>Capital Improvement Projects managed by Design Engineering teams are added to a database which is then processed by GIS staff and added to this layer. The viewable layer is intended to show only current projects that have not been completed. Updates to this layer occur on a regular basis, as needed.</SPAN></P></DIV></DIV></DIV>
Value: East Alvin Dr Tree Planting (N. Main to Natividad) - Dist 6 Label: East Alvin Dr Tree Planting (N. Main to Natividad) - Dist 6 Description: N/A Symbol:
Value: Las Casitas/Nogal Sidewalk Repair and ADA Ramp Installation - Dist 1 Label: Las Casitas/Nogal Sidewalk Repair and ADA Ramp Installation - Dist 1 Description: N/A Symbol:
Value: Navajo/Main T.S. Project Lights/Sidewalk/ADA. Project supports the Credit Union and Gabilan Library Project. Label: Navajo/Main T.S. Project Lights/Sidewalk/ADA. Project supports the Credit Union and Gabilan Library Project. Description: N/A Symbol:
Value: Polk St Sidewalk and ADA Repair (Tyler St to Tulane St) - Dist. 5 Label: Polk St Sidewalk and ADA Repair (Tyler St to Tulane St) - Dist. 5 Description: N/A Symbol: