ArcGIS REST Services Directory Login
JSON

Legend (Hosted/Capital_Improvement_Projects)

Capital Improvement Projects (0)
Airport Blvd Interchange Airport Blvd Interchange
Alisal Corridor Complete Streets Plan Alisal Corridor Complete Streets Plan
Alisal/Airport Multiuse Trail Alisal/Airport Multiuse Trail
BARDIN ROAD-SAFE ROUTES TO SCHOOL BARDIN ROAD-SAFE ROUTES TO SCHOOL
Boronda Road Congestion Relief Project - Phase 1  Boronda Road Congestion Relief Project - Phase 1 
Boronda Road Congestion Relief Project - Phase 2A Boronda Road Congestion Relief Project - Phase 2A
Boronda Road Congestion Relief Project - Phase 2B Boronda Road Congestion Relief Project - Phase 2B
Boronda Road Congestion Relief Project - Phase 3 Boronda Road Congestion Relief Project - Phase 3
Chinatown Renewal Street Chinatown Renewal Street
City Hall Reroof - 200 Lincoln Ave City Hall Reroof - 200 Lincoln Ave
Corporation Yard Storm Drain NPDES Corporation Yard Storm Drain NPDES
District 1 Chip Seal Improvements District 1 Chip Seal Improvements
District 2 Chip Seal Improvements District 2 Chip Seal Improvements
District 3 Chip Seal Improvements District 3 Chip Seal Improvements
District 4 Chip Seal Improvements District 4 Chip Seal Improvements
District 5 Chip Seal Improvements District 5 Chip Seal Improvements
Downtown Complete Streets Downtown Complete Streets
Downtown Complete Streets (Phase 2) Downtown Complete Streets (Phase 2)
E Lake Street Pump Station Upgrades E Lake Street Pump Station Upgrades
E. Alvin Dr Safe Routes to School E. Alvin Dr Safe Routes to School
East Alisal & Murphy Street Traffic Signal East Alisal & Murphy Street Traffic Signal
East Alvin Dr Tree Planting (N. Main to Natividad) - Dist 6 East Alvin Dr Tree Planting (N. Main to Natividad) - Dist 6
East Laurel Dr Pedestrian Improvements East Laurel Dr Pedestrian Improvements
Fire Station #1 Reroof, Window Replacement, & Skylight Replacement, (216 W Alisal St) Fire Station #1 Reroof, Window Replacement, & Skylight Replacement, (216 W Alisal St)
Gabilan Creek Silt Removal  Gabilan Creek Silt Removal 
Independence Blvd Road Improvements Independence Blvd Road Improvements
Industrial Waste Lift Station Industrial Waste Lift Station
Industrial Wastewater Treatment Facility Repairs Industrial Wastewater Treatment Facility Repairs
Inspection of S Sanborn Bridge Inspection of S Sanborn Bridge
La Guardia Lift Station Upgrades La Guardia Lift Station Upgrades
Las Casitas and Constitution Intersection Improvements Las Casitas and Constitution Intersection Improvements
Las Casitas/Nogal Sidewalk Repair and ADA Ramp Installation - Dist 1 Las Casitas/Nogal Sidewalk Repair and ADA Ramp Installation - Dist 1
Main Street Streetscape Project Main Street Streetscape Project
Monte Bella Detention Basins Desiltation/Repair Monte Bella Detention Basins Desiltation/Repair
N Main St/Boronda Rd Impvts N Main St/Boronda Rd Impvts
Natividad Creek Park restroom renovation Natividad Creek Park restroom renovation
Natividad Creek Silt Removal Natividad Creek Silt Removal
Navajo/Main T.S. Project Lights/Sidewalk/ADA. Project supports the Credit Union and Gabilan Library Project. Navajo/Main T.S. Project Lights/Sidewalk/ADA. Project supports the Credit Union and Gabilan Library Project.
Old Municipal Pool Building Retrofit- Phase 1  Old Municipal Pool Building Retrofit- Phase 1 
Pedestrian Crossing enhancements Pedestrian Crossing enhancements
Police Services Headquarters Police Services Headquarters
Polk St Sidewalk and ADA Repair (Tyler St to Tulane St) - Dist. 5 Polk St Sidewalk and ADA Repair (Tyler St to Tulane St) - Dist. 5
Runway 13-31 and Runway 8-26 Rehabilitation Runway 13-31 and Runway 8-26 Rehabilitation
SR-183 Relinquishment SR-183 Relinquishment
Salinas Municipal Airport Runway 8-26 and Heliport Rehabilitation Project; FAA AIP No. 3-06-0206-28 Salinas Municipal Airport Runway 8-26 and Heliport Rehabilitation Project; FAA AIP No. 3-06-0206-28
Salinas River Channel Outfall Repairs Salinas River Channel Outfall Repairs
San Juan Grade Road Improvements San Juan Grade Road Improvements
Sanitary Sewer Lines Evaluation Sanitary Sewer Lines Evaluation
Santa Rita Storm Channel Santa Rita Storm Channel
Skyway/Airport Traffic Control Analysis Skyway/Airport Traffic Control Analysis
Soccer Field Cesar Chavez Park Soccer Field Cesar Chavez Park
Street Light Installation in East Salinas phase 13 Street Light Installation in East Salinas phase 13
Summit/Hilltop Dr Sidewalk and ADA Repair JOC - Dist 4 Summit/Hilltop Dr Sidewalk and ADA Repair JOC - Dist 4
Sun Market Intersection Sun Market Intersection
T/S Boronda & Sanborn Rd T/S Boronda & Sanborn Rd
Tennis Courts Backstop/Wall Replacement at Central Park Tennis Courts Backstop/Wall Replacement at Central Park
Tennis Courts Improvements at Claremont Park Tennis Courts Improvements at Claremont Park
Tennis Courts Repairs at Laurel Park Tennis Courts Repairs at Laurel Park
Traffic Calming Program Traffic Calming Program
Traffic Signal Coordination (Front/Sherwood Adaptive Traffic Control System) Traffic Signal Coordination (Front/Sherwood Adaptive Traffic Control System)
US 101 Improvements Through Salinas US 101 Improvements Through Salinas
Vibrancy Plan Infrastructure Vibrancy Plan Infrastructure
W Alvin Drive Sanitary Sewer Line Upgrade W Alvin Drive Sanitary Sewer Line Upgrade
WILLIAMS ROAD UNDERGROUND DISTRICT - RULE 20A UTILITY UNDERGROUNDING WILLIAMS ROAD UNDERGROUND DISTRICT - RULE 20A UTILITY UNDERGROUNDING
Williams Rd Improvements Project (phase 1) Williams Rd Improvements Project (phase 1)